Most power plants have steam turbine cross-over expansion joints with 2-ply testable bellows. These redundant bellows are often overlooked during the piping system inspection.

A demonstration is provided with a recommended test fixture for safe and easy testing between the bellows plies. This is a video that is of interest to maintenance and turbine engineers, and inspectors.

2-Ply Testable Bellows For Steam Turbines

Most power plants have steam turbine cross-over expansion joints with 2-ply testable bellows. These redundant bellows are often overlooked during the piping system inspection.

Related keyterms:

2-ply testable bellows
Steam turbine cross over expansion joint
Westinghouse steam turbine
GE steam turbine
Steam turbine bellows

Share:

About The Author

Greg Perkins
Greg Perkins
President & General Manager

Greg Perkins has 25 years experience in the expansion joint industry. In his previous employment with Senior Flexonics Pathway, Greg Perkins held the position of CEO and General Manager for 11 years. Prior positions include project engineer, director of engineering, and business unit manager.

In addition Greg, a degreed engineer, served on both the EJMA (expansion joint manufacturers association) technical and management committee tasked with developing/updating bellows and expansion joint performance criteria. Proficient in ASME design codes. Patents include high temperature piping restraint structures for expansion joint applications.

Got questions? Need answers? Call Greg today (830) 626-7773 or send him an email [email protected]!